1. System setup
2. Appliances / outlets
Select an outlet and its loading units and design flow are filled automatically. Then choose the tee on the main run that supplies that outlet. Appliance selection now also chooses the matching terminal automatically. Baths include a 22 mm thermostatic blending valve, mixer showers use a manufacturer pressure/flow curve, and electric showers are identified as cold-mains outlets and excluded from the storage-cistern network. WC isolation/FOV settings remain automatic.
3. Pipe sections
Pipe sections are generated from the total tee count. If a tee starts a second main, the final tee letter is used for that route rather than adding another tee. The residual head at the end of a section is carried into every section that starts at that node.
4. Worksheet
The calculation sequence is kept left-to-right. Pipe sizes are shown as external copper tube sizes; the corresponding internal bore is used automatically for hydraulic calculations. Blue fields are calculated automatically; yellow fields are entered/selected. Length and rise/fall fields clear when selected for a fresh entry. Use Auto size pipes after all lengths, levels and fittings are entered.
1 Pipe Reference |
2 Loading Unitsactual / equiv |
3 Design Flow RateL/s |
4 Pipe Sizeexternal mm |
5 Velocitym/s |
6 Head Loss RkPa/m |
7 Drop + / Rise −m |
7A Pressure effectkPa |
8 Available HeadkPa |
9 Measured Lengthm |
10 Fittingsequiv m |
11 Total Effectivem |
12 Pipe LosskPa |
13 Terminal / Fitting |
14 ResidualkPa |
15 Residual at EndkPa |
16 Surplus / DeficitkPa |
17 PASS / FAIL |
|---|